
See more sold heavy equipment in Texas.
Heavy Equipment in Texas sold in 33% of closed auctions this past year, with a median of 11 bids per lot.
From 609 completed sales in our archive.
One request, sent to every mover that serves this lot's category and state. Each button copies it and opens that company's quote form, so you paste instead of retyping.
Item: Lincoln Eagle 10,000 Plus Welder Generator with Long Leads Like New Machine with Only 5.4 Hours Pickup: Goldthwaite, TX 76844 Loading help on site: please advise (assume none) Please quote pickup, any packing or crating, and transport.
On-site crating and freight, 65+ locations. Names auction and government shipping as service lines.
Marketplace where carriers bid for the load. Partners with Ritchie Bros. for auction wins.
Open deck heavy haul: flatbed, step deck, RGN and lowboy, all 50 states.
Ordered by fit. We take no commission from any of them.
This aggregated auction listing is being sold by Proxibid in Goldthwaite, Texas. BidProwl's Flip Score puts it at 70/100, which scores around the median for heavy equipment.
Built from live listing data. Check the full description and inspect before bidding.
Portable and towable generators from emergency services and public works, from small inverter units to trailer-mounted diesels. See real generator hammer prices from the last 12 months, or narrow it to what they go for in Texas.
Goldthwaite, TX 76844
Open in Google MapsLive Oak Realty & Auction
Seller on Proxibid
Based on 137 comparable in-state Generator sold lots.
Median sold
$311
Pro shows the typical range and your estimated resale margin.
Unlock with ProEstimates from comparable past auctions. Excludes transport, buyer fees, and resale markup. Not investment advice.

$3,000
Tools Industrial · PA · 4d 23h

$480
Tools Industrial · VA · 6d 18h
$0
Heavy Equipment · TX · 22h 37m

$20
Heavy Equipment · TX · 11d 2h